1. Preliminary preparation

1.1 Design

Hydraulic components and sealing components have different requirements in terms of dimensional tolerance, surface roughness, shape and position tolerance, etc. Therefore, the geometric accuracy of each component must be ensured and the correct seal must be selected during design.

Hydraulic Cylinder Design Drawing

1.2 Steel material selection: Commonly used steels are #20 steel, #45 steel, and 40Cr. The hardness of the steel is different, the applicable working conditions are different, and the price is also different, so comprehensive consideration is required.

2.The Production Processing

2.1 Cylinder body

Generally, seamless steel pipes without bending or deformation are selected. In order to ensure its good toughness and plasticity, it needs to go through a series of processing.

Steel Pile Manufacturing Prcoess

Cut the steel pipe into required length.

1730298582298

Threads are machined on the inner walls of both ends of the steel pipe.

1730298659427

Drill oil holes at appropriate locations and weld oil pipes.

1730298718564
1730298799644
1730298799653

During the production of hydraulic cylinders, many processes such as cylinder barrels and piston rods require welding. High-precision welding machines can ensure welding quality.

1730298959237

Scraping and polishing: Scraping and polishing machines ensure the accuracy and quality of tube hole processing and obtain excellent surface finish.

1730298983392
1730313507420

2.2 Piston rod

Select a solid steel column of specified specifications and use a CNC machine tool to process it into the required piston rod. CNC machine tools can ensure the accuracy of piston rod processing.

1730313563057

Grinding and electroplating of piston rod.

1730313768962

One end of the piston rod needs to be threaded and have cylinders of different diameters.

1730313847402
1730313880091

2.3 Piston base

Use a solid steel rod, drill a hole in the center of one end of the piston according to the size of the piston rod, and machine grooves on the inner wall of the hole and the outer ring of the piston.

1730314076563

Install sealing rings on the inner and outer grooves, put the piston on one end of the piston rod, and tighten the nut.

1730314147059
1730314236063
1730314246982

3.Cleaning

Cleanliness plays a very important role in the performance of the hydraulic cylinder. Before assembly, all parts need to be cleaned.

1730314340444

4.Assembly

Assemble cylinder body parts, piston rod parts, and other parts.

1730314476461

5.Testing

5.1 Appearance inspection: Check whether the physical appearance is good.

5.2 Dimension inspection: Use an outside diameter micrometer to check the sealing groove and outside diameter of the piston rod to ensure that the size tolerance is within the drawing requirements; use a vernier caliper and micrometer to check the length and outside diameter of the cylinder.

5.3 Performance test:Starting pressure, pressure resistance, and durability test.

You might also be interested:

Related Posts

Hydraulic Testing Projects With China National Offshore Oil Corporation

Hydraulic Testing Projects With China National Offshore Oil Corporation

Project Images Project Introduction Hydraulic Testing Projects With China National Offshore Oil Corporation
RIVERLAKE HYDRAULIC CYLINDER

Customer Visit RIVERLAKE for Hydraulic Cylinder Quality Inspection

Project Manager Mr. Igor from our customer in The Czech Republic came to the RIVERLAKE factory workshop for quality inspection of 96 units of 150-ton CLRG series double-acting hydraulic cylinders. Detail tests were carried out to measure the cylinder dimensions, inner and external cylinder appearance, and static and dynamic load testing on a test bench. Everything went smoothly and both parties signed an acceptance protocol.
hydraulic cylinder creep

19 reasons for hydraulic cylinder creep and corresponding troubleshooting methods

The hydraulic cylinder often has a jumping and stopping movement state during operation, which we call creeping phenomenon. This phenomenon is especially easy to occur at low speed, which is also one of the main faults of hydraulic cylinder.To solve the problem of hydraulic cylinder creep, we must study the cause of this phenomenon. After summarizing, we found that the cause for hydraulic cylinder creep not only have something to do with the hydraulic cylinder itself and also related to other factors outside the cylinder. Let’s talk about it today. Internal causes of hydraulic cylinder creep failure ① There is residual air in the cylinder, and the working medium forms an elastic body. Troubleshooting method: Fully exhaust the air; check whether the diameter of the hydraulic pump suction pipe is too small, and the suction pipe joint should be well sealed to prevent the pump from sucking air. ② The sealing friction is too large. Troubleshooting method: The piston rod and the guide sleeve are matched with H8/f8, and the depth and width of the sealing ring groove are strictly made according to the dimensional tolerance; if a V-shaped sealing ring is used, adjust the sealing friction to a moderate degree. ③ The sliding parts
Pile load testing hydraulic jack

North-South Commuter Railway Extension Project 1569 Ton Pile Load Testing

Project Images Project Introduction The North-South Commuter Railway, also known as the Clark–Calamba Railway, is a 147-kilometer urban rail transit system under construction on the island of Luzon, Philippines, primarily in the Greater Manila Area. The project will utilize the Japanese railway system that uses energy-efficient and reliable trains.  RIVERLAKE supplied a pile load testing system consisting of 2 units of 1000-ton hydraulic cylinders and 1 unit PLC-controlled electric hydraulic power unit. The system will perform pile load testing work up to 1569 tons in the NSCR Extension Project. RIVERLAKE PLC controlled hydraulic jacking system is designed for pile load tests up to 2000 tons where the load is to be applied in different stages and displayed accurately in real-time. The plc pile load test jacking system provides 6 default tonnage options, user can preset the loading tonnage and holding period of time for each option. During pile load test operation, the whole process is run automatically, just select one of the preset tonnages and press the auto-run button. the hydraulic jack will raise to its full stroke, upon reaching the preset load, the jacking system will stop automatically and hold the pressure for the preset period of time. The