Hydraulic Testing Projects With China National Offshore Oil Corporation
Project Images Project Introduction Hydraulic Testing Projects With China National Offshore Oil Corporation

Low Height Pancake Hydraulic Cylinder Used In Auger Boring Steerable Rock System
Project Images Project Introduction 50-ton low height pancake hydraulic cylinders used in auger boring steerable rock system.Steerable head designed for boring through sand or soft rock with real-time steering adjustments made out of the pit with a hydraulic control system. The Steerable Rock System (SRS) is the auger boring market’s first steerable head designed to navigate not only solid rock but difficult fractured rock conditions as well. Engineered to operate in rock up to 25,000 psi, the SRS allows operators to keep bores online and grade even in the toughest ground conditions for an on-grade bore. On the drilling head, there is peace’s of small round pipe, that’s where the cylinders sit. There are 4 pcs 50-ton pancake hydraulic cylinders on each side(top, bottom, right, and left) of the steerable head for a total of 16pcs, it works when it’s drilling horizontally underground we use the cylinders to navigate the drilling head.

North-South Commuter Railway Extension Project 1569 Ton Pile Load Testing
Project Images Project Introduction The North-South Commuter Railway, also known as the Clark–Calamba Railway, is a 147-kilometer urban rail transit system under construction on the island of Luzon, Philippines, primarily in the Greater Manila Area. The project will utilize the Japanese railway system that uses energy-efficient and reliable trains. RIVERLAKE supplied a pile load testing system consisting of 2 units of 1000-ton hydraulic cylinders and 1 unit PLC-controlled electric hydraulic power unit. The system will perform pile load testing work up to 1569 tons in the NSCR Extension Project. RIVERLAKE PLC controlled hydraulic jacking system is designed for pile load tests up to 2000 tons where the load is to be applied in different stages and displayed accurately in real-time. The plc pile load test jacking system provides 6 default tonnage options, user can preset the loading tonnage and holding period of time for each option. During pile load test operation, the whole process is run automatically, just select one of the preset tonnages and press the auto-run button. the hydraulic jack will raise to its full stroke, upon reaching the preset load, the jacking system will stop automatically and hold the pressure for the preset period of time. The
RIVERLAKE THAILAND
Project pictures from our Thailand distributor. Customers are very satisfied.