Project Introduction

The North-South Commuter Railway, also known as the Clark–Calamba Railway, is a 147-kilometer urban rail transit system under construction on the island of Luzon, Philippines, primarily in the Greater Manila Area. The project will utilize the Japanese railway system that uses energy-efficient and reliable trains. 

RIVERLAKE supplied a pile load testing system consisting of 2 units of 1000-ton hydraulic cylinders and 1 unit PLC-controlled electric hydraulic power unit. The system will perform pile load testing work up to 1569 tons in the NSCR Extension Project.

RIVERLAKE PLC controlled hydraulic jacking system is designed for pile load tests up to 2000 tons where the load is to be applied in different stages and displayed accurately in real-time. The plc pile load test jacking system provides 6 default tonnage options, user can preset the loading tonnage and holding period of time for each option. During pile load test operation, the whole process is run automatically, just select one of the preset tonnages and press the auto-run button. the hydraulic jack will raise to its full stroke, upon reaching the preset load, the jacking system will stop automatically and hold the pressure for the preset period of time. The PLC touch screen will display the real-time load and pressure accurately. After testing is complete at this stage, select a new tonnage for the next stage, change the holding time if necessary, then press autorun to repeat the whole process.

Related Posts

RIVERLAKE Bearing Replacement Work For Royal Hills Australia

RIVERLAKE Successfully Completes Critical Bearing Replacement at Australia’s Royal Hills Iron Ore Mine

From July 15 to August 1, 2025, RIVERLAKE engineers, led by Mr. Bob, deployed to Australia. Working in close collaboration with our exclusive Australian dealer, STRUXIT PTY LTD, the team provided expert training and guided the successful bearing replacement operation at the world-class Royal Hills iron ore mine. The complex procedure was executed using RIVERLAKE’s advanced 8-point synchronous lifting system, ensuring precise alignment and control throughout. The entire operation proceeded smoothly and achieved outstanding results, minimizing downtime for this critical Australian mining asset. This successful project at Royal Hills – a major integrated iron ore mining, rail, and port operation – underscores RIVERLAKE’s expertise in delivering innovative and reliable heavy lifting solutions for the global mining industry. See the project in action! Videos and images from the operation are available below:
RIVERLAKE HYDRAULIC CYLINDER

Customer Visit RIVERLAKE for Hydraulic Cylinder Quality Inspection

Project Manager Mr. Igor from our customer in The Czech Republic came to the RIVERLAKE factory workshop for quality inspection of 96 units of 150-ton CLRG series double-acting hydraulic cylinders. Detail tests were carried out to measure the cylinder dimensions, inner and external cylinder appearance, and static and dynamic load testing on a test bench. Everything went smoothly and both parties signed an acceptance protocol.
Hydraulic Jacking And Skidding System For Transformer Relocation

Transformer Relocation In South Africa

Project Images Project Introduction Taizhou Chuanhu Hydraulic Machinery Co., Ltd delivered 6 double-acting hydraulic cylinders and a petrol-driven hydraulic power unit for the skidding and sliding systems. The Power Pack and hydraulic cylinders are used for electric transformer relocation.
Synchronous Lifting Pump

How to realize synchronous control of multiple hydraulic cylinders

In hydraulic systems, hydraulic cylinders are widely used in a variety of scenarios such as heavy lifting operations, propulsion operations, and driving operations. In these systems, the synchronous operation of multiple hydraulic cylinders is an important part of ensuring the efficient and safe operation of the equipment. The synchronization of hydraulic cylinders can not only improve the efficiency of operations, but also avoid equipment damage caused by inconsistent movement. This article will explore in depth the principles of the synchronous movement of multiple hydraulic cylinders, common synchronization methods, technical challenges, and precautions during operation. 1. Working principle of hydraulic cylinder synchronization Hydraulic cylinder synchronization means that multiple cylinders extend or retract at the same speed and force at the same time. The core lies in the uniform distribution of hydraulic fluid and the precise control of pressure. The realization of synchronous operation depends on the following key factors: Fluid dynamics: The basic principle of the hydraulic system is to use the incompressibility of the liquid to convert pressure into power. The synchronous movement of the cylinder is achieved by controlling the direction and flow of the liquid flow. Load balancing: When multiple hydraulic cylinders share the load, ensure that each